Provides administrative and clerical support to the Director of Engineering, Assistant City Engineers for Water/Sewer and Traffic, Stormwater Engineer, and other departmental employees. Yashica Mills-Hyman, Administrative Assistant – 25 Provides administrative and financial oversight for the City’s public transportation system Tar River Transit. Todd Gardner, Transit System Manager – 25 Additionally, responsible for ensuring that new development projects conform to City requirements as related to transportation. Responsible for ensuring safe and efficient operation of the street system in accordance with NCDOT (NC Department of Transportation) and City standards, including traffic signals, street signs, pavement markings, and transportation planning. VACANT, PE, PTOE, Assistant City Engineer (Transportation) – 25 Additionally, responsible for ensuring that new development projects conform to City and State requirements as related to water and sewer. Responsible for design and administration of city capital projects, including water and sewer extensions. Scott Miles, PE, Assistant City Engineer (Water and Sewer) – 25 Responsible for all phases of engineering for the City, including construction inspection, traffic engineering and traffic signals, signs and marking, water & sewer, and stormwater. Supervises a staff of 121 employees and a budget of $946,000. This information does not constitute legal advice, is not intended to constitute legal advice, nor should it be relied upon as legal advice for your specific factual pattern or situation.Brad Kerr, PE, Director of Public Works – 252- 972-1120 If you would like to speak with a Greensboro construction lawyer, please contact us today.ĭisclaimer: The information contained in this article is for general educational information only. To learn about other important standards and specifications for NCDOT projects, read part two. Additionally, bidders must verify that all work will be provided by their own “bona fide employees and subcontractors.” Bidding on behalf of another contractor violates NCDOT’s Standard Specifications for Roads and Structures. To minimize the opportunity for contractors to engage in collusion, all bidding contractors must submit a form verifying that have not taken any action that would challenge the outcome of NCDOT’s free competitive bidding system. Section 102-9(B) - Non-Collusion CertificationĬontractors are barred from participating in any action that compromises the otherwise fair distribution and award of NCDOT contracts. In addition to the electronic bid, contractors must include the following when submitting an electronic bid: Section 102-8(B) - Electronic BidsĬontractors who are unable to submit their bid electronically via Bid Express will not be able to submit a claim against NCDOT for any contracts that were not awarded as a result. In addition, they will be tasked with requalifying every three years. Purchase Order Bidders must renew their prequalification annually. This includes completing the Bidder Experience Questionnaire, demonstrating ability and experience to NCDOT, showcasing a portfolio of past projects and relevant experience, and more. Purchase Order Bidders who have not been placed on the Prequalified Bidders’ List must follow the guidelines for bidder prequalification outlined in Section 102-2(A). Section 102-2(B) - Purchase Order Bidder PrequalificationĪpproved contractors can be added to the Prequalified Bidders’ List to perform work for NCDOT as a Purchase Order Bidder without any further application. Starting with Section 102-2(B), which covers purchase order bidder prequalification, we will cover a variety of topics in this two-part series including electronic bid submittal, anti-collusion measures, contractor disqualification, and more. This 829-page document is a lot to get through on your own, fortunately the experienced construction law professionals at our Greensboro construction law firm have handpicked some of the most important subsections from the “General Requirements” section of this extensive document to help you protect your contracting firm’s best interests when supplying labor and materials to an NCDOT project. Signals and Intelligent Transportation Systems.Erosion Control and Roadside Development.Pavement Markings, Markers, and Delineation.NCDOT’s “ Standard Specifications for Roads and Structures ” includes sections covering: Government Contracts Important Standards and Specifications for NCDOT Projects Part 1Ĭontractors who engage in business with the North Carolina Department of Transportation (NCDOT) must be wary of the laws and regulations governing the standards for performing public works projects like highway construction and repairs.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |